Civic Issue #1057 · Drainage / Blocked drain
New Market Waterlogging at Crossing
Bus bay crossing, New Market, Bhopal · reported 28 Aug 2026 (7d ago)
62/100
Medium priority
Blocked drain reported at Bus bay crossing that may create a safety risk for people using the location.
Likely owner: Sewerage & Drainage Division (Demo) · assigned to Drainage
Location
AI recommendation
Make the location safe first — barricade or temporary treatment — then schedule permanent work. Safety exposure is the largest single driver of this priority score.
Community discussion summary: Most citizens report that worsens after rain, and that it standing water. Comments focus on day-to-day impact rather than blame.
Evidence (5)
- Simulated evidence
Blocked drain mouth
Devendra Patel
- Simulated evidence
Waterlogging across the carriageway
Kavita Rathore
- Simulated evidence
Sewage backflow near the gate
Imran Sheikh
- Simulated evidence
Silt deposit after the last rain
Meera Joshi
- Simulated evidence
Open drain without a cover
Faizan Ali
Citizen reports (1)
Pooja Bhargava7d ago
Waterlogging at the bus bay crossing within minutes of rain.
Timeline
Issue reported
28 Aug, 9:30 am
First report filed from New Market.
Pooja Bhargava
AI understanding complete
28 Aug, 10:30 am
Classified as Drainage → Blocked drain. Severity medium, urgency medium.
Claude
Routed to Er. P. R. Solanki
28 Aug, 11:30 am
Routed to Er. P. R. Solanki (Assistant Engineer — Sewerage & Drainage (Demo)) at Drainage. Field work is carried out by: Desilting contractor — Jet-Suction Desilting Unit — Contract D/11 (Demo). Response window: 10 days.
Direct routing
Community support threshold crossed
31 Aug, 9:30 am
44 citizens have supported this issue and 36 have declared they are affected.
Community