Bhopal Civic Intelligence

Municipal workspace · read-only preview

Simulated Authority DashboardClaude simulationCitizen view
You are viewing the dashboard as a guest. Sign in as the demo authority user to assign, respond and resolve. Sign in
Back to queue

Civic Issue #1044 · Drainage / Blocked drain

Shahpura Drain Overflow

Lake road junction, Shahpura, Bhopal · reported 19 Aug 2026 (16d ago)

84/100

High priority

high severityhigh urgencySafety riskunder review19 reporters62 affected74 supporters9 evidence

Blocked drain reported at Lake road junction that may create a safety risk for people using the location.

Likely owner: Sewerage & Drainage Division (Demo) · assigned to Drainage

Location

Filter
Bhopal · 1 issues
CriticalHighMediumResolved
Built-in fallback map · add NEXT_PUBLIC_MAPBOX_TOKEN for live Mapbox tiles

AI recommendation

Make the location safe first — barricade or temporary treatment — then schedule permanent work. Safety exposure is the largest single driver of this priority score.

Community discussion summary: Most citizens report that school route affected, and that it children affected. Comments focus on day-to-day impact rather than blame.

Evidence (9)

  • Blocked drain mouth

    Naveen Shukla

  • Waterlogging across the carriageway

    Priya Raghuvanshi

  • Sewage backflow near the gate

    Chandan Sahu

  • Silt deposit after the last rain

    Zoya Ansari

  • Open drain without a cover

    Mohit Jain

  • Blocked drain mouth

    Anjali Pawar

  • Waterlogging across the carriageway

    Girish Barde

  • Sewage backflow near the gate

    Farah Siddiqui

  • Silt deposit after the last rain

    Mohit Jain

Citizen reports (3)

  • Zoya Ansari16d ago

    Drain overflowing near lake road, sewage on the street after every rain.

  • Chandan Sahu15d ago

    Nali blocked at the junction, water stands for two days after it rains.

  • Priya Raghuvanshi14d ago

    Waterlogging at Shahpura junction. Two-wheelers stall in the middle of the road.

Timeline

  1. Issue reported

    19 Aug, 9:30 am

    First report filed from Shahpura.

    Zoya Ansari

  2. AI understanding complete

    19 Aug, 10:30 am

    Classified as Drainage → Blocked drain. Severity high, urgency high.

    Claude

  3. Routed to Er. P. R. Solanki

    19 Aug, 11:30 am

    Routed to Er. P. R. Solanki (Assistant Engineer — Sewerage & Drainage (Demo)) at Drainage. Field work is carried out by: Desilting contractor — Jet-Suction Desilting Unit — Contract D/11 (Demo). Response window: 10 days.

    Direct routing

  4. 2 similar reports merged

    20 Aug, 9:30 am

    Reports within 400 m describing the same problem were combined into Civic Issue #1044.

    Duplicate clustering

  5. Community support threshold crossed

    26 Aug, 9:30 am

    74 citizens have supported this issue and 62 have declared they are affected.

    Community

  6. Marked Under Review

    27 Aug, 9:30 am

    Issue acknowledged in the simulated authority dashboard and queued for site inspection.

    Sewerage & Drainage Division (Demo)