Bhopal Civic Intelligence

Municipal workspace · read-only preview

Simulated Authority DashboardClaude simulationCitizen view
You are viewing the dashboard as a guest. Sign in as the demo authority user to assign, respond and resolve. Sign in
Back to queue

Civic Issue #1042 · Roads / Pothole

MP Nagar Road Pothole

Zone-II main road, near the bus stop, MP Nagar, Bhopal · reported 14 Aug 2026 (21d ago)

89/100

Critical priority

high severityhigh urgencySafety riskin progress43 reporters43 affected127 supporters17 evidence

Pothole reported at Zone-II main road, near the bus stop that may create a safety risk for people using the location.

Likely owner: Municipal Road Authority (Demo) · assigned to Roads & Infrastructure

Location

Filter
Bhopal · 1 issues
CriticalHighMediumResolved
Built-in fallback map · add NEXT_PUBLIC_MAPBOX_TOKEN for live Mapbox tiles

AI recommendation

Make the location safe first — barricade or temporary treatment — then schedule permanent work. Safety exposure is the largest single driver of this priority score.

Community discussion summary: Most citizens report that hard to see at night, and that it two-wheeler riders at risk. Several mention the problem has recurred despite earlier complaints.

Evidence (17)

  • Wide view of the damaged stretch

    Rohit Malviya

  • Close-up showing depth of the cavity

    Ananya Verma

  • Night photo — edge is not visible

    Prakash Yadav

  • Two-wheeler swerving around the spot

    Sadaf Khan

  • Water collected inside the damage

    Girish Barde

  • Wide view of the damaged stretch

    Farah Siddiqui

  • Close-up showing depth of the cavity

    Mohit Jain

  • Night photo — edge is not visible

    Anjali Pawar

  • Two-wheeler swerving around the spot

    Chandan Sahu

Showing 9 of 17 evidence items.

Citizen reports (4)

  • Rohit Malviya21d ago

    Big pothole near MP Nagar bus stop, two-wheelers are slipping every evening.

  • Sadaf Khan20d ago

    Road damaged near MP Nagar Zone 2. My scooter hit it last night, the edge is not visible after dark.

  • Prakash Yadav19d ago

    Large pothole at the same location as before. It was patched two months ago and has opened again.

  • Meera Joshi17d ago

    Water filled crater on the main road. Autos brake suddenly here and cause near-misses.

Timeline

  1. Issue reported

    14 Aug, 9:30 am

    First report filed from MP Nagar.

    Rohit Malviya

  2. AI understanding complete

    14 Aug, 10:30 am

    Classified as Roads → Pothole. Severity high, urgency high.

    Claude

  3. Routed to Er. S. K. Chaturvedi

    14 Aug, 11:30 am

    Routed to Er. S. K. Chaturvedi (Executive Engineer — Roads, Zone 4 (Demo)) at Roads & Infrastructure. Field work is carried out by: Road maintenance contractor — Zone-4 Patchwork Crew — Contract R/24 (Demo). Response window: 14 days.

    Direct routing

  4. 3 similar reports merged

    15 Aug, 9:30 am

    Reports within 400 m describing the same problem were combined into Civic Issue #1042.

    Duplicate clustering

  5. Community support threshold crossed

    23 Aug, 9:30 am

    127 citizens have supported this issue and 43 have declared they are affected.

    Community

  6. Marked Under Review

    25 Aug, 9:30 am

    Issue acknowledged in the simulated authority dashboard and queued for site inspection.

    Municipal Road Authority (Demo)

  7. Marked In Progress

    29 Aug, 9:30 am

    Work order raised against this location in the demo environment.

    Municipal Road Authority (Demo)

  8. Official response added

    30 Aug, 9:30 am

    Site inspected by the zonal team. Temporary patching has been scheduled and permanent resurfacing of this stretch is being estimated. (Demo response in a simulated authority environment.)

    Municipal Road Authority (Demo)