Civic Issue #1042 · Roads / Pothole
MP Nagar Road Pothole
Zone-II main road, near the bus stop, MP Nagar, Bhopal · reported 6 Oct 2026 (21d ago)
89/100
Critical priority
Pothole reported at Zone-II main road, near the bus stop that may create a safety risk for people using the location.
Likely owner: Municipal Road Authority (Demo) · assigned to Roads & Infrastructure
Location
AI recommendation
Make the location safe first — barricade or temporary treatment — then schedule permanent work. Safety exposure is the largest single driver of this priority score.
Community discussion summary: Most citizens report that hard to see at night, and that it two-wheeler riders at risk. Several mention the problem has recurred despite earlier complaints.
Evidence (17)
- Simulated evidence
Wide view of the damaged stretch
Rohit Malviya
- Simulated evidence
Close-up showing depth of the cavity
Ananya Verma
- Simulated evidence
Night photo — edge is not visible
Prakash Yadav
- Simulated evidence
Two-wheeler swerving around the spot
Sadaf Khan
- Simulated evidence
Water collected inside the damage
Girish Barde
- Simulated evidence
Wide view of the damaged stretch
Farah Siddiqui
- Simulated evidence
Close-up showing depth of the cavity
Mohit Jain
- Simulated evidence
Night photo — edge is not visible
Anjali Pawar
- Simulated evidence
Two-wheeler swerving around the spot
Chandan Sahu
Showing 9 of 17 evidence items.
Citizen reports (4)
Rohit Malviya21d ago
Big pothole near MP Nagar bus stop, two-wheelers are slipping every evening.
Sadaf Khan19d ago
Road damaged near MP Nagar Zone 2. My scooter hit it last night, the edge is not visible after dark.
Prakash Yadav18d ago
Large pothole at the same location as before. It was patched two months ago and has opened again.
Meera Joshi17d ago
Water filled crater on the main road. Autos brake suddenly here and cause near-misses.
Timeline
Issue reported
6 Oct, 9:30 am
First report filed from MP Nagar.
Rohit Malviya
AI understanding complete
6 Oct, 10:30 am
Classified as Roads → Pothole. Severity high, urgency high.
Claude
Routed to Er. S. K. Chaturvedi
6 Oct, 11:30 am
Routed to Er. S. K. Chaturvedi (Executive Engineer — Roads, Zone 4 (Demo)) at Roads & Infrastructure. Field work is carried out by: Road maintenance contractor — Zone-4 Patchwork Crew — Contract R/24 (Demo). Response window: 14 days.
Direct routing
3 similar reports merged
7 Oct, 9:30 am
Reports within 400 m describing the same problem were combined into Civic Issue #1042.
Duplicate clustering
Community support threshold crossed
15 Oct, 9:30 am
127 citizens have supported this issue and 43 have declared they are affected.
Community
Marked Under Review
17 Oct, 9:30 am
Issue acknowledged in the simulated authority dashboard and queued for site inspection.
Municipal Road Authority (Demo)
Marked In Progress
21 Oct, 9:30 am
Work order raised against this location in the demo environment.
Municipal Road Authority (Demo)
Official response added
22 Oct, 9:30 am
Site inspected by the zonal team. Temporary patching has been scheduled and permanent resurfacing of this stretch is being estimated. (Demo response in a simulated authority environment.)
Municipal Road Authority (Demo)